Names

Name

Definition

Type

Impact Bond Name - (Value)

Full name of the Social Impact Bond. What counts as an Impact Bond project? It is a contractual relationship that includes two core factors:

• Payment for social or environmental outcomes achieved

• Up-front repayable finance provided by a third party, the repayment of which is (at least partially) conditional on achieving specified outcomes.

Each impact bond project that begins work under a new contract, with a new target cohort, a distinct geography, and/or with a later start date is counted separately.

Text

Name

Definition

Type

Alternative Names - (Value)

Additional or informal names should be specified in this variable. If the project has more than one alternative name, they should be separated by commas.

Text

Stage of Development

Name

Definition

Type

Stage of Development - (Value)

Stage of development of the project at the moment of data collection.

Codelist options are:

  • Early-stage design
  • Late-stage design
  • Contracted
  • Implementation
  • Service delivery complete
  • Complete

Codelist

Stage of Development - (Source ID’s)

Stage of development of the project at the moment of data collection.

Text

Jurisdiction

Name

Definition

Type

Jurisdiction - Jurisdiction - (Value)

Project jurisdiction describes a project’s origins, using the place it is governed or organised from, under law, as a proxy.

Codelist options are:

A 2 character country code from ISO 3166. Eg: GB, US

Codelist

Jurisdiction - (Source ID’s)

Text

Jurisdiction - (Notes)

Text

Dates

Name

Definition

Type

Dates - Date outcomes contract signed - (Value)

Date on which the outcomes contract was signed. If signed by parties on different dates, select the latest date of signature.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Dates - Date contracts between all parties signed - (Value)

The date on which the full set of required contracts between impact bonds parties received sign off. That is the date – whichever is the later – on which parties signed the outcomes contract; service delivery contract; investment contract or any other contract signalling the agreement to the impact bond arrangement such that full contracting arrangements are signed.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Dates - Anticipated completion date - (Value)

Expected date when final outcomes payments will be made.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Dates - Actual completion date - (Value)

Actual date when final outcomes payments were made.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Dates - Start date of service provision - (Value)

Date when service provision started/will start.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Dates - Anticipated end date of service provision - (Value)

Expected date when service provision will end.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Dates - Actual end date of service provision - (Value)

Actual date when service provision ended/will end.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Dates - (Source ID’s)

Text

Dates - (Notes)

Text

Overall project finance

Name

Definition

Type

Overall project finance - Total investment commitment - Currency - (Value)

Currency in which financial data is reported for this project.

Text

Overall project finance - Total investment commitment - Amount - Min - (Value)

When it is not possible to share the exact amount of total investment, projects can present a range with minimun and maximum values.

Number

Overall project finance - Total investment commitment - Amount - Exact - (Value)

Total investment amount committed by investors (capital raised), as contractually agreed. Note that this should not include any recycled outcome payments.

Number

Overall project finance - Total investment commitment - Amount - Max - (Value)

When it is not possible to share the exact amount of total investment, projects can present a range with minimun and maximum values.

Number

Overall project finance - Total investment commitment - Amount USD - Min - (Value)

Minimum investment amount in US dollars.

Number

Overall project finance - Total investment commitment - Amount USD - Exact - (Value)

Exact investment amount in US dollars.

Number

Overall project finance - Total investment commitment - Amount USD - Max - (Value)

Maximum investment amount in US dollars.

Number

Overall project finance - Maximum potential outcome payment - Currency - (Value)

Total maximum payments for outcomes from outcome funders. This should be equal to “contract cap”.

Text

Overall project finance - Maximum potential outcome payment - Amount - (Value)

Total maximum payments for outcomes from outcome funders. This should be equal to “contract cap”.

Number

Overall project finance - Maximum potential outcome payment - Amount USD - (Value)

Total maximum payments for outcomes from outcome funders. This should be equal to “contract cap”.

Number

Overall project finance - Maximum potential loss - (Value)

Percentage of principal that investors stand to lose in a worst-case scenario. Please provide for each investor, if different.

Text

Overall project finance - Maximum potential return type - (Value)

This variable identifies whether the return is average annual return or IRR (Internal rate of return).

Text

Overall project finance - Maximum potential return - (Value)

Percentage return that investors expect to gain in best case scenario. Return can be understood as the profit on an investment. This is typically the ratio of the income from the investment over the cost of the investment. Please provide for each investor, if different.

Text

Overall project finance - Configuration of the Contracting Parties - (Value)

A description of the bilateral or multilateral relationship between contracting parties. It identifies which party/parties hold the contract with the outcome funder (or which actor has majority control of a contract-holding Special Purpose Vehicle).

Text

Overall project finance - Investor repayment - (Value)

To be completed at the end of the project. Extent to which investment and return was paid to investor.

Text

Overall project finance - Total outcome payments made - Currency - (Value)

Currency in which outcome payments data is reported for this project.

Text

Overall project finance - Total outcome payments made - Amount - (Value)

Total actual payments for outcomes disbursed by outcome payers.

Number

Overall project finance - Total outcome payments made - Amount USD - (Value)

Total actual payments for outcomes disbursed by outcome payers in USD. This will be calculated by GO Lab staff.

Number

Overall project finance - (Source ID’s)

Text

Overall project finance - (Notes)

Text

Purpose and classifications

Name

Definition

Type

Purpose and classifications - Social challenge - (Value)

Broad definition of the social challenges that the project addresses.

Text

Purpose and classifications - Intervention - (Value)

Description of the intervention supported by the Impact Bond.

Text

Purpose and classifications - Policy sector - (Value)

Main policy sector in which the project is based.

Codelist options are:

  • Employment and training
  • Child and family welfare
  • Health
  • Homelessness
  • Education
  • Criminal justice
  • Agriculture and environment
  • Poverty reduction

Codelist

Purpose and classifications - Primary SDG goal - (Value)

Primary Sustainable Development Goal (SDG) in which the project is based. To be selected from the 17 SDGs defined in the United Nations 2030 Agenda (2015) https://sdgs.un.org/2030agenda. [This is at the project level. This is also captured at the outcome level]

Text

Purpose and classifications - Secondary SDG goals - (Value)

Secondary Sustainable Development Goal (SDG) in which the project is based. Primary SDG Goal must not be included in this variable. [This is at the project level. This is also captured at the outcome level]

Text

Purpose and classifications - Primary SDG target - (Value)

This variable identifies what primary SGD target the project is addressing. See United Nations 2030 Agenda (2015) https://sdgs.un.org/2030agenda. [This is at the project level. This is also captured at the outcome level]

Text

Purpose and classifications - Secondary SDG targets - (Value)

This variable identifies what secondary SGD target the project is addressing. Primary SDG target must not be included in this variable. See United Nations 2030 Agenda (2015) https://sdgs.un.org/2030agenda. [This is at the project level. This is also captured at the outcome level]

Text

Purpose and classifications - (Source ID’s)

Text

Purpose and classifications - (Notes)

Text

Service and beneficiaries

Name

Definition

Type

Service and beneficiaries - Target population - (Value)

Description of the population targeted by the project and any eligibility requirement for the cohort of people who are to be offered support.

Text

Service and beneficiaries - Targeted number of unique service users or beneficiaries (total) - (Value)

Intended number of individuals in the target population who will be engaged in the service/intervention and/or whose social outcomes will be evaluated for outcome contract payment calculation.

Number

Service and beneficiaries - Unit type of targeted service users or beneficiaries - (Value)

Description of the unit of measurement that is used to account for targeted service users or beneficiaries.

Codelist options are:

  • Individual
  • Other

Codelist

Service and beneficiaries - Unit description of targeted service user or beneficiaries - (Value)

This field will only be completed if the answer to the last variable was “other”. This variable identifies what type of unit of measurement is used to account for targeted service users or beneficiaries.

Text

Service and beneficiaries - Actual number of unique service users or beneficiaries engaged (total) - (Value)

Effective number of service users after the project was completed. The actual number of service users may differ from the targeted number, as forecasted at the beginnings of the project.

Number

Service and beneficiaries - Unit type of actual service users or beneficiaries engaged - (Value)

Description of the unit of measurement that is used to account for targeted service users or beneficiaries.

Codelist options are:

  • Individual
  • Other

Codelist

Service and beneficiaries - Unit description of actual service user or beneficiaries engaged - (Value)

This field will only be completed if the answer to the last variable was “other”. This variable identifies what type of unit of measurement is used to account for actual number of service users or beneficiaries.

Text

Service and beneficiaries - (Source ID’s)

Text

Service and beneficiaries - (Notes)

Text

Changes to project due to COVID-19

Name

Definition

Type

Changes to project due to COVID-19 - (Value)

Codelist options are:

  • Pause project
  • Continue on outcomes contract without variations
  • Continue on outcomes contract with variations
  • Switch to grant payments based on medium scenarios

Codelist

Changes to project due to COVID-19 - (Source ID’s)

Text

Outcome Funds

Name

Definition

Type

Id

Text

Sources

Text

Notes

Text

When viewing data, other variables from the fund data model may be included to provide more information. See the Fund data dictionary for more information on what these variables mean.

Delivery Locations

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Service Provision ID - (Value)

Text

Location - Name - (Value)

Name of the city or region where services are provided.

Text

Location - Postcode - (Value)

Postal code of the location where services are provided.

Text

Location - Country - (Value)

Country where services are provided.

Codelist options are:

A 2 character country code from ISO 3166. Eg: GB, US

Codelist

Lat/Lng - Lat - (Value)

Latitude and longitude coordinates. GO Lab will add or double check this variable. This variable feeds into the map(s) on the GO Lab website.

Number

Lat/Lng - Lng - (Value)

Latitude and longitude coordinates. GO Lab will add or double check this variable. This variable feeds into the map(s) on the GO Lab website.

Number

Adminstrative geography - Name - (Value)

Text

Adminstrative geography - Code Type - (Value)

Text

Adminstrative geography - Code - (Value)

Text

Sources

Text

Notes

Text

Sources

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Id

A within-project original, flexible identifiers to be referenced in another sheet. This can be set by the GO Lab analyst.

Text

Name - (Value)

Name of the person or institution who shared information about this project.

Text

Type - (Value)

Type of source of information.

Text

Publishing Organisations - (Value)

Organisation that published the evaluation, report, document or website that is cited as a source.

Text

URL - (Value)

URL of the document about this project.

Text

Archive URL - (Value)

A preserved copy of an online source that can be accessed if the original page is moved, changes, or disappears.

Text

Internal URL - (Value)

Text

Publication Date - (Value)

Date when the information about this project was published.

Text

Accessed Date - (Value)

Date when the information about this project was accessed.

Text

Notes

Text

Organisations

When viewing data, variables from the organisation data model may be included to provide more information. See the Organisation data dictionary for more information on what these variables mean.

The organisations listed are those referenced in other parts of the project, such as Service Provisions.

Service Provisions

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Id

A within-project original, flexible identifiers to be referenced in another sheet. This can be set by the analyst.

Text

Organisation ID - (Value)

INDIGO identifier of the organisation that provides services for this impact bond project. See INDIGO Identifiers section.

Text

Organisation Role Category - (Value)

Category of service provider.

Codelist options are:

  • Nonprofit/NGO
  • Foundation/Philanthropist
  • Government/Public Sector/Public Bank
  • For-profit
  • Other

Codelist

Intervention - (Value)

Description of the intervention or the activities that service providers are funded to address the social challenge.

Text

Planned Service - Start - (Value)

Expected date when service delivery starts.

Text

Planned Service - End - (Value)

Expected date when service delivery ends.

Text

Actual Service - Start - (Value)

Actual date when service delivery starts.

Text

Actual Service - End - (Value)

Actual date when service delivery ends.

Text

Alterations to service - Description - (Value)

This variable specifies whether there has been a modification in the service delivery. Where there are multiple alterations, this field should describe all alterations that have taken place.

Text

Alterations to service - Reason - (Value)

This variable presents the motivation for that modification, if applicable. Where there are multiple alterations, this field should describe the reason for all alterations that have taken place.

Text

Sources

Text

Notes

Text

Outcome Payment Commitments

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Organisation ID - (Value)

INDIGO identifier of the organisation that pays for social outcomes in this impact bond project. See INDIGO Identifiers section.

Text

Organisation Role Category - (Value)

Category of outcome payer

Codelist options are:

  • Nonprofit/NGO
  • Foundation/Philanthropist
  • Government/Public Sector/Public Bank
  • Multilateral/Bilateral/Intergovernmental Financial Institution
  • Corporate Giving
  • Investment Fund
  • Other

Codelist

Maximum potential Outcome payment - Currency - (Value)

Total maximum payments for outcomes from each outcome payer. Currency.

Text

Maximum potential Outcome payment - Amount - (Value)

Total maximum payments for outcomes from each outcome payer.

Number

Maximum potential Outcome payment - Amount USD - (Value)

Total maximum payments for outcomes from each outcome payer. In USD.

Number

Result type - (Value)

This variable specifies whether a result is interim or over all (final).

Codelist options are:

  • Interim
  • Overall

Codelist

Period - Start - (Value)

This variable provides the start date of the performance period.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Period - End - (Value)

This variable provides the end date of the performance period.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Total outcome payments made - Currency - (Value)

Currency in which outcome payments are reported for this project.

Text

Total outcome payments made - Amount - (Value)

Total actual payments for outcomes disbursed by outcome payers in relevant local currency.

Number

Total outcome payments made - Amount USD - (Value)

Total actual payments for outcomes disbursed by outcome payers in USD.

Number

Alterations to payment commitment - Description - (Value)

Detail of the modifications to payment commitments occured during the life of the impact bond project.

Text

Alterations to payment commitment - Reason - (Value)

Brief explanation of the reasons behind the modifications to payment commitments occured during the life of the impact bond project.

Text

Sources

Text

Notes

Text

Investments

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Id

A within-project original, flexible identifiers to be referenced in another sheet. This can be set by the GO Lab analyst.

Text

Organisation ID - (Value)

INDIGO identifier for the organisation that invested upfront capital for this project. See INDIGO Identifiers section.

Text

Organisation Role Category - (Value)

Codelist options are:

  • Nonprofit/NGO
  • Foundation/Philanthropist
  • Government/Public Sector/Public Bank
  • Multilateral/Bilateral/Intergovernmental Financial Institution
  • Corporate Giving
  • Investment Fund
  • High Net Worth Individual/Family Office/Private Bank
  • Impact Investor
  • Commercial

Codelist

Investment Commitment - Currency - (Value)

Currency in which investments are reported for this project.

Text

Investment Commitment - Amount - Min - (Value)

When it is not possible to share exact amounts, projects can share a range with minimum and maximum amount of investment committed by each investor.

Number

Investment Commitment - Amount - Exact - (Value)

Exact amount of committed investment from each investor.

Number

Investment Commitment - Amount - Max - (Value)

When it is not possible to share exact amounts, projects can share a range with minimum and maximum amount of investment committed by each investor.

Number

Investment Commitment - Amount USD - Min - (Value)

Minimum amount of investment committed by each investor in USD (when it is not possible to have exact amount in USD).

Number

Investment Commitment - Amount USD - Exact - (Value)

Exact amount of investment committed by each investor in USD.

Number

Investment Commitment - Amount USD - Max - (Value)

Maximum amount of investment committed by each investor in USD (when it is not possible to have exact amount in USD).

Number

Maximum Potential loss - (Value)

Percentage of principal that investors stand to lose in a worst-case scenario.

Text

Maximum Potential Return Type - (Value)

This variable specifies whether the maximum potential return type is measured as average annual return or IRR.

Codelist options are:

  • IRR
  • Average annual return

Codelist

Maximum Potential Return - (Value)

Percentage return that investors stand to gain in best case scenario.

Number

Investor Repayment - (Value)

Extent to which investment and return was paid to investor.

Codelist options are:

  • No repayment (no principle or return)
  • Some repayment (but below value of principle)
  • Principal repaid (but no net return)
  • Principal + positive financial returns
  • Not publicly available

Codelist

Investment Type - (Value)

This variable identifies whether this investment qualifies as debt, equity or a combination of both.

Codelist options are:

  • Debt
  • Equity
  • Combination

Codelist

Sources

Text

Notes

Text

Intermediary services

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Organisation ID - (Value)

INDIGO identifier for the organisation that provides intermediary services for this project. See INDIGO Identifiers section.

Text

Organisation Role Category - (Value)

The role(s) or key functions performed by each of the named intermediaries.

Codelist options are:

  • Impact bond design
  • Financial and commercial modeling
  • Impact bond investment structure
  • Capital raise
  • Loan arranger
  • Performance management
  • Legal counsel
  • Technical assistance
  • Other

Codelist

Other Role Description - (Value)

If an organization is providing a role that is not listed above, it can be listed in this field.

Text

Sources

Text

Notes

Text

Outcome Metrics

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Id

A within-project original, flexible identifiers to be referenced in another sheet. This can be set by any analyst. The outcome is what changes for an individual as the result of a service or intervention.

Text

Outcome Definition - (Value)

An outcome target or metric is the specific value attached to the measure of outcomes for the purposes of determining whether satisfactory performance has been achieved. In an impact bond, these targets will usually determine whether a payment is made to the provider or investor.

This variable provides a detailed description of the metric(s) used to determine payments from the outcome payers. It should provide a clear definition of the conditions under which an outcome is agreed to have been ‘achieved’ or ‘not achieved’.

Text

Target Population - (Value)

Description of the targeted population of beneficiaries or service users.

Text

Targeted number of service users Or beneficiaries (total) - (Value)

Targeted number of beneficiaries/service users for each outcome metric

Number

Unit type of targeted Service users or beneficiaries - (Value)

Description of the unit of measurement that is used to account for targeted service users or beneficiaries.

Codelist options are:

  • Individual
  • Other

Codelist

Unit description of Service user or beneficiaries - (Value)

This field will only be completed if the answer to the last variable was “other”. This variable identifies what type of unit of measurement is used to account for targeted service users or beneficiaries.

Text

Outcome metric target - (Value)

Targeted levels of outcome metrics to be achieved (e.g. the proportion of people supported who are expected to achieve a given outcome)

Text

Other target for Meeting outcome metric target - (Value)

This variable identifies information about other/secondary targets that need to be met in order to achieve the outcome.

Text

Outcome validation Method - (Value)

The approach taken to assessing whether the specified outcomes have been achieved and the basis on which ‘outcome payments’ will be made. This could take the form of validated administrative data (for example in a rate card for youth engagement where young people achieve education outcomes, the production of these qualifications may be used as the basis of outcome payments) or a formal and independent impact evaluation (for example under a Randomised Control Trial or quasi-experimental study outcome payments are only made when the performance of the treatment group is significantly improved when compared to the control group). To be selected from: Randomised Control Trial; Quasi-experimental study; Historical comparison (e.g. comparison to historical benchmark); Pre-Post analysis (measurement of outcomes for target individual or cohort before and after intervention); Simple ex-post verification; Not available.

Text

Data source for Outcome validation - (Value)

The sources of information for outcome validation could be existing administrative data or new data collected.

Text

Policy sector - (Value)

Main policy sector in which the project is based.

Text

Primary SDG goal - (Value)

Primary Sustainable Development Goal (SDG) in which the project is based. To be selected from the 17 SDGs defined in the United Nations 2030 Agenda (2015) https://sdgs.un.org/2030agenda.

Text

Secondary SDG goals - (Value)

Secondary Sustainable Development Goal (SDG) in which the project is based. Primary SDG Goal must not be included in this variable.

Text

Primary SDG target - (Value)

This variable identifies what primary SGD target the project is addressing. See United Nations 2030 Agenda (2015) https://sdgs.un.org/2030agenda.

Text

Secondary SDG targets - (Value)

This variable identifies what secondary SGD target the project is addressing. Primary SDG target must not be included in this variable. See United Nations 2030 Agenda (2015) https://sdgs.un.org/2030agenda.

Text

Sources

Text

Notes

Text

Outcome Pricing

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Outcome Metric Id - (Value)

A within-project original, flexible identifier to be referenced in another sheet. This can be set by the GO Lab analyst. This ID should be equal to the ID that was stated in the “Results” and “Outcome metrics” sections.

Text

Currency - (Value)

Currency in which outcome pricing data is reported for this project.

Text

Price Per Unit - Amount - (Value)

Price per unit, often a participant, for whom outcomes are achieved. Price here is the cost to the outcome payer. This is to be populated only if there is a single outcome which is measured at the unit /individual level. Use the currency stated in the above field.

Number

Price Per Unit - Amount USD - (Value)

Price per unit, often a participant, for whom outcomes are achieved in USD. Price here is the cost to the outcome payer.

Number

Maximum Price if all targets achieved - Amount - (Value)

Maximum price if all targets related to that outcome are achieved.

Text

Contracted increases to outcome pricing - (Value)

If certain price increases have been contracted (e.g. inflation adjustments), an description of these terms should be provided.

Text

Price Description - (Value)

Text

Sources

Text

Notes

Text

Results

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Outcome Metric Id - (Value)

A within-project original, flexible identifiers to be referenced in another sheet. This can be set by a GO Lab analyst.

Text

Result level - (Value)

This variable specifies whether a result was captured at the outcome level or project level.

Codelist options are:

  • Project level
  • Outcome level

Codelist

Result type - (Value)

This variable specifies whether a result is interim or final.

Codelist options are:

  • Interim
  • Final

Codelist

Period - Start - (Value)

This variable provides the start date of the performance period.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Period - End - (Value)

This variable provides the end date of the performance period.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Outcomes achieved - (Value)

A description of the outcomes that were achieved, according to the specifications of the contract.

Text

Number engaged In impact bond - (Value)

Number of users or beneficiaries who engaged in the impact bond project.

Number

Number with Positive social outcomes - (Value)

Number of users or beneficiaries who engaged in the impact bond project and achieved positive outcomes.

Number

Other Description of result - (Value)

A broader description of the results of the impact bond, if applicable.

Text

Outcomes validator(s) - (Value)

Name(s) of organization(s) responsible for validating the achievement of outcomes or otherwise assessing the metrics underpinning outcome payments. One outcome can have two or more validators.

Text

Evaluation Documents - (Value)

An evaluation is an objective assessment of a programme to determine whether and to what degree the intervention in an impact bond project has had an impact on the measured outcome variables over time. This variable provides a link to any published evaluations, if applicable.

Text

Sources

Text

Notes

Text

Outcome Payments

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Outcome Metric Id - (Value)

A within-project original, flexible identifier to be referenced in another sheet. This can be set by a GO Lab analyst.

Text

Period - Start - (Value)

Start date of claim period.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Period - End - (Value)

End date of claim period.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Payer Organisation ID - (Value)

INDIGO ID of organisation that is paying for outcomes.

Text

Recipient Organisation ID - (Value)

INDIGO ID of organisation that is receiving payment for outcomes.

Text

Type - (Value)

Codelist options are:

  • Planned
  • Actual

Codelist

Payments - Currency - (Value)

Currency in which outcome payments are reported for this project.

Text

Payments - Amount - (Value)

Amount of outcome payments received in this period in relevant currency.

Number

Payments - Amount USD - (Value)

Amount of outcome payments received in this period in USD.

Number

Sources

Text

Notes

Text

Open Contracting

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

OCID

OCID identifier that links this impact bond project with data on the contracting process.

Text

Sources

Text

Notes

Text

360Giving

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Grant ID

360Giving identifier that links this impact bond project with data on received grants.

Text

Sources

Text

Notes

Text

Documents

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Title - (Value)

Title of related document or case study.

Text

URL - (Value)

URL of related document or case study.

Text

Notes

Text

Scenarios

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Scenario Id

Text

Name - (Value)

Text

Overall project finance - Maximum potential outcome payment - Currency - (Value)

Text

Overall project finance - Maximum potential outcome payment - Amount - (Value)

Number

Overall project finance - Maximum potential outcome payment - Amount USD - (Value)

Number

Sources

Text

Notes

Text

Social Investment Prototype

The Social Investment Prototype offers additional tabs to describe technical assistance and the financial aspects of projects in greater detail, including individual transactions.

On the General Overview tab:

Name

Definition

Type

Social Investment Prototype - (Value)

Codelist options are:

  • YES
  • NO

Codelist

Investment Details

Expected and latest internal rates of return can be recorded on the investment details tab (This may be in the general overview tab).

Name

Definition

Type

Investment Details - Total Funds Invested - Latest - Currency - (Value)

The currency of the investment data provided.

Text

Investment Details - Total Funds Invested - Latest - Amount - (Value)

The total invested amount to date.

Number

Investment Details - Total Funds Invested - Latest - Amount USD - (Value)

To be calculated by GO Lab staff using the year in the above date and World Bank data available online at https://data.worldbank.org/indicator/PA.NUS.FCRF [Note that this variable does not capture and may misrepresent fluctuations over different years. This is an issue being tackled in the prototyping process.]

Number

Investment Details - Total Funds Invested - Latest - Date - (Value)

The date.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Investment Details - Internal Rate of Return - Target - (Value)

The targeted rate of return of an investment on the project after all costs have been considered, to determine profitability (net IRR)

Text

Investment Details - Internal Rate of Return - Latest - (Value)

The latest actual rate of return of an investment on the project after all costs have been considered, to determine profitability. Reported as date below. If actual IRR is not being reported seek to indicate if Actual IRR exceeds Target IRR (yes/no)

Text

Investment Details - Internal Rate of Return - Date - (Value)

Date

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Investment Details - (Source ID’s)

Text

Investment Details - (Notes)

Text

Transactions

The transactions tab is designed as a ledger of money in and money out of a project.

A transaction is modelled with a sending organisation and a receiving organisation, a date and an amount. These fields are required.

The value of a transaction (Amount) must be positive.

A transaction can be linked to the project as a whole (the default) or to a:

  • Outcome payment (using the Outcome Metric ID column to link to the relevant row on the Outcome Metrics tab);

  • Investment (using the Investment ID column to link to the relevant row on the Investment tab); or,

  • Grant (using the Grant ID column to link to the relevant row on the Grants tab).

Only one of these IDs should appear per row, i.e. transactions should be disaggregated where possible. This is particularly important if the data is to be used in further analysis or visualisations.

The transaction type field is used to identify the purpose of the transaction.

The formatting rules on dates and currency values should be followed.

This is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Investment Id - (Value)

A within-project original, flexible identifier to be referenced in another sheet.

Text

Outcome Metric Id - (Value)

A within-project original, flexible identifier to be referenced in another sheet.

Text

Grant Id - (Value)

Text

Date - (Value)

Date when the transaction occurred.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Sending Organisation ID - (Value)

INDIGO ID of the organisation that makes the transaction.

Text

Receiving Organisation ID - (Value)

INDIGO ID of the organisation that receives the transaction.

Text

Transaction Type - (Value)

This variable specifies whether the transaction is a debt or repayment of debt, equity, payment for an outcome or other type of transaction.

Codelist options are:

  • Debt
  • Grant
  • Equity
  • Debt and Equity
  • Interest Payment
  • Capital Repayment
  • Capital Repayment and Interest
  • Outcome Payment
  • Other

Codelist

Money - Currency - (Value)

Currency in which transaction data is reported.

Text

Money - Amount - (Value)

Total amount of the transaction in relevant currency.

Number

Money - Amount USD - (Value)

Total amount of the transaction in USD.

Number

Sources

Text

Notes

Text

Technical Assistance

Technical Assistance is modelled as a period of engagement between a funding organisation and a recipient organisation with a defined start and end date.

This period of engagement can be broken down on the Technical Assistance Details tab into a series of component activities (as well as high-level information that covers the whole engagement where appropriate).

An activity is linked to an engagement by using the relevant id from the Technical Assistance tab. Multiple activities can be linked to a single engagement.

Data should not be provided if no technical assistance from a given category has been given, i.e., zero values are not necessary but assumed in the absence of data.

Each activity can be assigned a cost and a cost type and a time cost in days.

Where no cost is available, or where a cost is inappropriate, a row can be added with the relevant category selected and the value and cost type fields left blank. This will allow activities to be analysed as simple counts.

Activities can be further classified by the delivery approach.

On the Technical Assistance tab, there is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Id

A within-project original, flexible identifiers to be referenced in another sheet. This can be set by any analyst. The outcome is what changes for an individual as the result of a service or intervention.

Text

Title - (Value)

A summary name for this element of TA. Note that each project may have multiple elements of TA. TA may be broken into different elements as necessary to allow the category, cost and/or other variables to be completed.

Text

Description - (Value)

Description of this element of TA.

Text

Period Start - (Value)

Date when this specific element of TA starts

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Period End - (Value)

Date when this specific element of TA finishes.

Enter a date in format YYYY, YYYY-MM or YYYY-MM-DD

Funding Organisation Id - (Value)

Id of the organization that pays for technical assistance.

Text

Recipient Organisation Id - (Value)

Id of the organization that receives technical assistance.

Text

Currency - (Value)

Currency in which costs of TA are described.

Text

Sources

Text

Notes

Text

On the Technical Assistance Details tab, there is a list. One project can have multiple items of data. One item of data is defined as:

Name

Definition

Type

Technical Assistance Id - (Value)

A within-project original, flexible identifier to be referenced in another sheet.

Text

Title - (Value)

A summary name for this element of TA.

Text

Description - (Value)

A description of this element of TA.

Text

Category - (Value)

This variable has a long list of options. TA should be broken into elements and one item from the list be selected for each element.

Codelist options are:

  • Overall TA - Planning - Project Management
  • Overall TA - Planning - Commissioning
  • Overall TA - Delivery - In-house Relationship
  • Overall TA - Delivery - In-house Specialist
  • Overall TA - Delivery - Pro-bono Partner
  • Overall TA - Delivery - External Consultant
  • Overall TA - Delivery - SPO Staff Member
  • Theory of Change and Impact Strategy - Support to develop the Theory of Change and Impact Strategy
  • Theory of Change and Impact Strategy - Support to develop an evaluation framework and performance measures
  • Developing an Impact Measurement System
  • Fundraising - Assistance securing funding from other sources
  • Fundraising - Use VPO's reputation to help grantees secure funding from other sources
  • Fundraising - Practical support with fundraising
  • Fundraising - Fundraising advice or strategy
  • Fundraising - Assistance securing follow-on funding
  • Revenue Strategy - Business Planning
  • Revenue Strategy - Business Model Development or Business Model Canvas)
  • Financial Management - Sound Financial Management Capabilities or Financial Management Tools
  • Financial Management - Develop Financial Systems
  • Financial Management - Financial Management Advice
  • Financial Management - Financial Planning or Accounting
  • Financial Management - Support To Establish New Financial Systems
  • Human Capital Support - Strengthening CEO And Management Team (Coaching And Mentoring
  • Human Capital Support - Recruitment And Talent Provision
  • Governance Support - Support to Develop Board of Directors
  • Governance Support - Advice or Assistance to Strengthen the Board or Governance System
  • Governance Support - Board Development or Governance Assistance
  • Governance Support - Assistance in Recruitment of New Board Members
  • Strategic Support - Strategy Consulting
  • Strategic Support - General Management Advice
  • Strategic Support - Strategic Planning Advice
  • Strategic Support - Support to Develop the Business Strategy
  • Strategic Support - Support to Develop New Products or Services
  • Strategic Support - Support to Develop New Business Systems or Procedures
  • Strategic Support - Advice on management of change
  • Operational Support - Marketing
  • Operational Support - Operational Management
  • Operational Support - Technical Assistance in Specialist Areas
  • Operational Support - ICT Advice
  • Operational Support - Support on Procurement
  • Operational Support - Estate Management or Access to Physical Space
  • Operational Support - Legal Advice
  • Funding - Financing Capacity Building Grants and Awards - Specific money allocated for non-financial support
  • Funding - Financing Capacity Building Grants and Awards - VPOs and VPO’s funders allocate specific resources to non-financial support
  • Funding - Financing Unrestricted Grants or Funding - Give unrestricted funding for capacity building
  • Funding - Financing Unrestricted Grants or Funding - VPOs and VPO’s funders allocate specific resources to non-financial support/external donations
  • Funding - Financing Grants and Contacts with External Capacity-building Providers - Develop Network of Capacity-building Providers
  • Funding - Financing Grants and Contacts with External Capacity-building Providers - External Parties Giving Support For Free
  • Funding - Financing Capacity Building Through Collaboration Among Funders And Beyond - Investors Team Up To Address Capacity-building Challenges
  • Funding - Financing Capacity Building Through Collaboration Among Funders And Beyond - VPOs and VPO’s Funders Allocate Specific Resources to Non-financial Support
  • Funding - Financing Management Fees
  • Funding - Financing the SPO to Pay for Non-financial Support or Matching
  • Funding - Financing Corporate Partners
  • Funding - Financing a VPO Subsidy

Codelist

Approach - (Value)

This variable captures different approaches in which a social investor can deliver TA.

Codelist options are:

  • SPO Board Seat (including Observers)
  • Coaching and mentoring
  • Trainings, Workshops and Boot Camps
  • Conferences and Other External Events
  • Access to Networks (External or Peers)
  • Specific Expertise (One-to-One or Groups)
  • Mentoring
  • Informal Relationship Management and Ad Hoc Support
  • Other Approach

Codelist

Cost Type - (Value)

Codelist options are:

  • Purchased or spent
  • In-kind
  • Staff cost
  • Other

Codelist

Cost of Activities - Amount - (Value)

Cost of Technical Assistance activities in relevant currency.

Number

Cost of Activities - Amount USD - (Value)

Cost of Technical Assistance activities in USD.

Number

Number of Days - (Value)

Cost of Technical Assistance activities in days of work.

Number

Sources

Text

Notes

Text